A lot has happened since the last update!
The lights on the 11th floor have been powered up and ceiling tile is being installed, the glass in the office fronts are being installed on the 2nd floor, conditioned air is blowing on the 1st, 2nd, 11th, and 12th floors, stone tile is being completed on the 1st and 2nd floors, the overhead doors at the garage entrances have been installed, and there is considerable construction activity on every floor.
The alley north of the new building was repaved during the holiday break, the work to complete the new sidewalk and treewells on Colorado Street continues, the removal of the east tower crane concrete foundation has taken longer than anticipated, the missing curtainwall panels are being installed, and the roof and the metal cladding of the mechanical penthouse are very close to completion.